Buying a Wooden Cabin or Garden Building in the UK and Ireland: The Complete 2026 Guide
Everything UK and Irish buyers need to know about purchasing a wooden cabin or garden building — planning permission, wall thickness, delivery, maintenance, and how to choose the right European supplier.

There is something quietly compelling about a wooden building at the end of a garden. Maybe it is the way timber ages — softening and silvering over the years rather than cracking and peeling. Maybe it is the smell of fresh-cut pine on the first morning after installation. Or maybe it is simply that, in a country where space is expensive and planning rules are notoriously complicated, a well-designed garden cabin represents a kind of freedom: a room of your own, built to your specification, sitting on your land.
Key thresholds for a detached garden building without a planning application (rules checked on 24 September 2026; see the sources at the end):
| Where | Maximum height | Near a boundary | Area / coverage | Other key conditions |
|---|---|---|---|---|
| England (permitted development, Class E) | 4 m with a dual-pitched roof, 3 m with any other roof; eaves max. 2.5 m; single storey | Max. 2.5 m high within 2 m of a boundary | All outbuildings and extensions max. 50% of the land around the original house | Not forward of the principal elevation; no bedroom or self-contained living; listed building: permission needed; National Parks, AONBs, the Broads, World Heritage Sites: max. 10 m² of buildings more than 20 m from the house |
| Wales | 4 m with more than one pitch, 3 m single-pitch or other roof, 2.5 m flat roof; eaves max. 2.5 m | Max. 2.5 m high within 2 m of a boundary | Max. 50% of the curtilage | Not in front of the principal elevation; extra limits in National Parks, AONBs and conservation areas |
| Scotland (Class 3A) | 4 m; eaves max. 3 m | Max. 2.5 m high within 1 m of the boundary | At least half of the front or rear curtilage stays undeveloped | Not forward of the principal elevation (or a side elevation facing a road); conservation area: max. 8 m² (4 m² at a listed building); not a separate dwelling |
| Northern Ireland (Class D) | 4 m | Eaves max. 2.5 m within 2 m of the boundary | Max. 50% of the curtilage | Not forward of a road-facing principal or side elevation; not within 3.5 m of a road boundary behind the house; not a dwelling |
| Republic of Ireland (Class 3) | 4 m with a tiled or slated pitched roof, 3 m in any other case | No separate boundary height rule in Class 3 | Total 30 m² (25 m² before 27 July 2026); at least 25 m² of private open space must remain to the rear or side | Not forward of the front wall; no human habitation; incidental use only |
| Building regulations (England and Wales) | Normally no approval needed under 15 m² with no sleeping accommodation, or 15–30 m² with no sleeping accommodation if at least 1 m from every boundary or built substantially of non-combustible materials. Over 30 m² or with sleeping accommodation: approval needed. | |||
Across the United Kingdom and Ireland, demand for wooden garden buildings has grown substantially over the past decade. The pandemic-era shift toward home working accelerated what was already a steady trend — and by 2026, garden offices, insulated summerhouses, and bespoke timber cabins have become a mainstream purchase rather than a niche one. Yet for many buyers, the process of finding a quality building remains unnecessarily confusing. The market is fragmented, terminology is inconsistent, and the gap between a flat-pack shed and a properly engineered timber structure is rarely made clear.
This guide is written for UK and Irish buyers who want to do it properly. Whether you are planning a garden office in Surrey, a weekend retreat in Connemara, or a year-round residential cabin on a rural plot in the Scottish Highlands, the decisions you make at the research stage — supplier, wall specification, foundation, planning — will determine whether your building lasts twenty years or twenty months.
What Kind of Wooden Building Do You Actually Need?
The first and most important question is not which building to buy, but what you actually need the building to do. This sounds obvious, but it is surprising how many buyers jump to dimensions and prices before they have properly defined the use case — and end up either over-specifying (and overspending) or, more commonly, under-specifying and regretting it within the first winter.
A garden office used five days a week by someone working from home has fundamentally different requirements from a summerhouse used on weekends between April and October. A residential annexe for an elderly relative has different structural, insulation, and regulatory requirements from a teenage games room. Getting this definition right before anything else saves time, money, and the particular frustration of ordering a building and realising mid-installation that it is not quite what you needed.
In broad terms, UK and Irish buyers tend to fall into one of five categories. The first is the home worker: someone who needs a proper office separate from the main house, with good insulation, year-round usability, and enough space for a desk, storage, and perhaps a meeting area. For this buyer, thermal performance is non-negotiable — a poorly insulated cabin becomes unbearable in January and insufferable in July. The second category is the occasional retreat: a summerhouse, studio, or hobby room used seasonally, where comfort matters but year-round heating bills do not. The third is the residential upgrade — a guest annexe, teenager's den, or rental accommodation — which brings its own planning and building regulation considerations. The fourth is the commercial or agricultural buyer: a farm office, retail cabin, or holiday letting unit. And the fifth, growing steadily, is the buyer who wants a full timber residential home on a rural plot.
Being honest about which of these categories applies to you will shape every subsequent decision, from wall thickness to foundation type to the supplier you choose.
Planning Permission in England, Scotland, Wales and Northern Ireland
Planning is the subject that preoccupies UK buyers more than any other, and with good reason. The rules are specific, occasionally counterintuitive, and carry real consequences if you get them wrong. The good news is that the majority of garden buildings — particularly single-storey timber structures used as outbuildings — fall within what is known as Permitted Development rights, meaning you do not need to apply for planning permission at all, provided certain conditions are met.
In England, garden buildings fall under Class E of the permitted development rules (Schedule 2, Part 1 of the Town and Country Planning (General Permitted Development) (England) Order 2015). An outbuilding needs no planning application if it meets every condition: it is single storey and not on land forward of the wall forming the principal elevation of the house (usually the wall facing the road); it is no higher than 4 metres with a dual-pitched roof or 3 metres with any other roof; its eaves are no higher than 2.5 metres; any part within 2 metres of a boundary is no higher than 2.5 metres; and, together with other outbuildings and extensions, it covers no more than 50% of the land around the house (the curtilage, excluding the ground area of the original house). Verandas, balconies and raised platforms higher than 0.3 metres are not allowed.
The 2-metre boundary rule is the one that most often decides where a log cabin can stand: a typical apex-roof cabin is taller than 2.5 metres, so it either has to sit at least 2 metres from every boundary or be built with a lower roof. Any model can be resized or given a lower roof pitch to fit a limit. Stricter rules apply on designated land. In National Parks, the Broads, Areas of Outstanding Natural Beauty and World Heritage Sites, buildings more than 20 metres from the house are limited to 10 square metres in total, and on designated land (which also includes conservation areas) a building at the side of the house needs planning permission. Within the curtilage of a listed building, any outbuilding needs planning permission. The full guidance, which is worth reading carefully before you order anything, is available on the Planning Portal.
There are important caveats. Class E only covers buildings used for purposes incidental to the enjoyment of the house. The government's technical guidance says this does not cover separate self-contained accommodation or primary living accommodation such as a bedroom, bathroom or kitchen, so a guest bedroom or residential annexe needs planning permission. Permitted development rights can also have been removed for your property by a planning condition or an Article 4 direction, and conservation areas and listed buildings bring extra restrictions, so check with your local planning authority before proceeding.
Building regulations are a separate question from planning. In England, a detached single-storey building with a floor area under 15 square metres and no sleeping accommodation will not normally need building regulations approval. Between 15 and 30 square metres it will not normally need approval either, provided it contains no sleeping accommodation and is at least 1 metre from any boundary or constructed substantially of non-combustible materials. A log cabin is built of timber, so a cabin of 15–30 square metres should stand at least 1 metre from every boundary to stay exempt. A building over 30 square metres, or any building with sleeping accommodation, needs approval.
Scotland, Wales and Northern Ireland each have their own rules. Wales uses similar limits: 4 metres for a roof with more than one pitch, 3 metres for a single-pitch or other roof, 2.5 metres for a flat roof, eaves no higher than 2.5 metres, no more than 2.5 metres high within 2 metres of a boundary, 50% coverage and nothing in front of the principal elevation, plus extra siting rules near highways and in National Parks, AONBs and conservation areas. The Welsh building regulations use the same 15 and 30 square metre thresholds as England. Scotland (Class 3A) allows a building up to 4 metres high with eaves up to 3 metres, no more than 2.5 metres high within 1 metre of the boundary, and at least half of the front or rear curtilage must stay undeveloped; in a conservation area the floor area is limited to 8 square metres (4 square metres in the curtilage of a listed building). A Scottish building warrant is normally not needed for a detached single-storey building of 8–30 square metres ancillary to a house, unless it is within 1 metre of the house (and not at least 1 metre from every boundary) or contains a fixed combustion appliance such as a stove or a sanitary facility, but the work must still meet the building standards. Northern Ireland (Class D) allows up to 4 metres in height, eaves no higher than 2.5 metres within 2 metres of the boundary, 50% coverage, nothing forward of a road-facing principal or side elevation and nothing within 3.5 metres of a road boundary behind the house. Northern Irish building regulations exempt a detached single-storey building up to 30 square metres with no sleeping accommodation if it is built substantially of non-combustible material or is at least 1 metre from the house, any road and the boundary (a separate exemption covers buildings up to 15 square metres at least 1 metre from a dwelling).
The practical upshot for many buyers is reassuring: a single-storey timber garden building used as a summerhouse, studio or hobby room, sized and placed within these limits, can often go ahead without an application. If you are in any doubt, ask your local planning authority before you order; in England you can also apply for a Lawful Development Certificate, which confirms in writing that the building is lawful. Always confirm the rules for your address with your council.
Planning Permission in the Republic of Ireland
Irish planning rules operate under a different legislative framework, governed by the Planning and Development Act and administered by local authorities rather than a centralised body. The principles, however, are broadly similar: smaller garden structures used for incidental domestic purposes are generally exempt from planning permission, while structures intended for habitation, commercial use, or that exceed certain size thresholds require a full application.
Garden buildings are covered by Class 3 in Schedule 2, Part 1 of the Planning and Development Regulations 2001, which was updated from 27 July 2026 (S.I. No. 338 of 2026). A shed, store, garage, garden room or similar structure within the curtilage of a house is exempted development if the total area of such structures, together with any built before, does not exceed 30 square metres (the limit was 25 square metres before 27 July 2026). It must not be forward of the front wall of the house, must not reduce the private open space to the rear or side of the house to less than 25 square metres, and must not be higher than 4 metres with a tiled or slated pitched roof, or 3 metres in any other case, so a pitched roof finished with felt or shingles may be held to the 3-metre limit. It may not be used for human habitation or for anything other than a purpose incidental to the enjoyment of the house, and if it stands at the side of the house its external finishes (and a tiled or slated roof) must match the house. The exemptions do not apply in the cases listed in Article 9 of the Regulations, for example where the work would breach a condition of an existing planning permission.
A separate new exemption, Class 3A (S.I. No. 340 of 2026), allows a detached auxiliary dwelling of 32 to 45 square metres in the rear garden, occupied together with the main house. Its conditions include: no more than 45 square metres together with existing Class 3 structures, the same 4-metre / 3-metre height limits, at least 0.6 metres from any wall or boundary, at least 25 square metres of private open space retained, no separate utility connections, no short-term letting, the owner must live in the main house, and the planning authority must be notified at least 14 days before work starts. It covers only work started and completed by 31 December 2030, and the building regulations (including fire safety) apply in full. For larger timber buildings, residential cabins or commercial structures, talk to your county council planning office before you order, and always confirm the rules for your site with the council. The Department of Housing's circular on the 2026 exempted development regulations summarises the changes.
The UK and Irish Climate: Why Wall Thickness Matters More Than You Think
The British and Irish climate is not extreme by European standards, but it is persistent. Average temperatures rarely fall below minus five degrees Celsius even in Scotland, and rarely exceed thirty degrees in summer — but the combination of high humidity, sustained rainfall, and variable temperatures year-round creates specific demands on a timber building that many buyers underestimate.
The primary challenge is moisture. Timber is a hygroscopic material — it absorbs and releases moisture in response to the surrounding environment — and in a climate where relative humidity is frequently above seventy percent, this has real consequences for structural stability, thermal performance, and longevity. A thin-walled timber building with inadequate treatment will absorb moisture during the wet months and release it in summer, leading to cyclic expansion and contraction, joint movement, and eventually the cracking and warping that characterises poorly built garden structures.
Wall thickness is the single most important variable in addressing this. A 44mm wall is adequate for dry storage or occasional seasonal use, but it provides minimal insulation and limited resistance to the moisture cycling that characterises the UK climate. For a building used as a home office or guest room, a minimum of 58mm — and ideally 70mm or a double 44+44mm system — represents the sensible baseline. The double-wall system is particularly well-suited to the UK and Ireland: the cavity between the two wall layers can be filled with insulation, effectively eliminating the moisture cycling problem while delivering thermal performance comparable to a well-built conventional extension.
We have written a detailed guide on choosing the right wall thickness for your timber building that covers each option in detail, including how to match specification to climate and use case. If you are buying for the UK or Ireland, we would recommend reading it before settling on a specification.
"We went with the 44+44mm double-wall system for our garden office in County Wicklow. The first winter completely justified it — the building stays warm without constant heating, and there has been no movement in the joints at all after two years."
— Michael R., Co. Wicklow, Ireland
Foundations: The Part Most Buyers Overlook
A timber building is only as good as what it sits on. This is an area where cutting corners tends to be expensive in the medium term, and where the difference between a building that lasts decades and one that develops problems within five years is often determined.
In the UK and Ireland, the ground is rarely frozen but frequently saturated, which means that foundations need to address drainage and movement rather than frost heave. The most common approach for garden buildings is a concrete pad or a pressure-treated timber frame on compacted hardcore, but the right solution depends on your specific site — its drainage characteristics, the slope, and the weight of the building being placed on it.
Satus Baltic buildings come with a standard 44×70mm timber base, with an upgrade option to a 70×70mm criss-cross system for larger or heavier structures. For UK and Irish sites, we generally recommend the upgraded base combined with a well-prepared external foundation — either a poured concrete pad or a proprietary adjustable steel post system, which allows for levelling on uneven ground and permits airflow beneath the floor to reduce moisture accumulation.
Finding a Reliable Supplier: European Manufacturers vs. UK Resellers
The UK wooden building market is broadly divided into two categories of supplier: domestic retailers and distributors who import finished or part-finished buildings and resell them, and European manufacturers who supply direct or through authorised dealers. Both have their place, but understanding the difference matters when you are making a significant purchase.
UK retailers and garden centre chains offer the significant advantage of proximity — you can see the product in person, deal with a local company, and have a straightforward point of contact if something goes wrong. The trade-off is that the buildings are typically sourced from a range of manufacturers, quality control is variable, and customisation options are limited. Most retail-channel timber buildings are designed to hit a price point rather than a performance specification.
Buying direct from a European manufacturer — or through an authorised dealer of a specific manufacturer — gives you access to a wider range of specifications, genuine customisation, and better value for the same or higher quality. The manufacturer knows exactly what they have built, can provide full technical documentation, and takes direct accountability for the product. The practical disadvantage is lead time: European manufacturers typically work to a production schedule, and delivery to the UK takes longer than sourcing from a domestic stockist. For a purchase you will be using for twenty years, this is rarely a compelling reason to compromise on quality.
When evaluating any supplier, whether domestic or European, there are several specific things worth checking. Does the timber carry FSC certification? This matters both for environmental reasons and as a proxy for supply chain discipline — manufacturers who track their timber sourcing carefully tend to take the same approach to production quality. We have explored why FSC certification matters in detail here.
Can the supplier provide documentation — treatment certificates, structural calculations, and material specifications — that would be required if you ever needed to satisfy a building inspector or insurer? Are windows and doors produced in-house or sourced externally? In-house production typically means better quality control and easier replacement if something is damaged in transit or during assembly. What is the warranty position, and who handles any post-delivery issues?
"As a reseller, I appreciate the reliable delivery times and consistent craftsmanship. Our customers love these wooden houses."
— Verified partner, United Kingdom
Delivery to the UK and Ireland: What the Process Looks Like
For buyers who have not purchased a timber building from a European manufacturer before, the logistics can feel opaque. In practice the process is straightforward, but it is worth knowing what to expect.
Buildings are manufactured to order in kit form — each component numbered, pre-cut, and packaged for efficient assembly. Delivery to the UK typically takes place by curtainsider truck, with most orders arriving within four to eight weeks of order confirmation. For Ireland, the kit also has to cross the sea, which adds a few days to the timeline; direct ferry routes from continental EU ports keep the shipment inside the EU, while routing through Great Britain adds customs transit formalities. The delivery vehicle drops the kit at your property boundary — crane offloading or access to the garden itself is your responsibility to arrange, and worth thinking about in advance if your access is restricted.
Customs and VAT after Brexit. A kit shipped from Lithuania to England, Scotland or Wales is an import. It needs a customs declaration, and import VAT is charged at the same rate as on a sale in the UK (20% standard rate). Customs duty depends on the commodity code: on the UK Global Tariff, prefabricated buildings of wood (9406 10 00 00) carry 2% third-country duty, or 0% under the UK–EU Trade and Cooperation Agreement when the goods qualify as EU origin and preference is correctly claimed. Most buyers let the haulier or a customs agent make the declaration; agree in advance who acts as importer and who pays duty and VAT. Northern Ireland follows different rules for goods coming from the EU. Ireland is in the EU, so no customs duty is payable on a kit from Lithuania; VAT is normally payable, and once a seller's cross-border sales to EU consumers exceed €10,000 a year it must charge Irish VAT (through Irish registration or the One Stop Shop). Rates and procedures change, so check them on gov.uk or revenue.ie before you order.
Assembly is either self-build, using the detailed technical documentation provided, or through a local contractor. Satus Baltic buildings are designed for efficient assembly — a 35 square metre building can typically be erected by two competent people in two to three days — but for larger structures or buyers who prefer professional installation, engaging a local timber frame contractor is a straightforward option. Satus Baltic can provide assembly documentation in advance so a contractor can assess the work and quote accordingly before delivery.
Maintaining a Wooden Building in a Wet Climate
The longevity of a timber building in the UK or Ireland is almost entirely a function of how well it is maintained, and maintenance is less demanding than most people assume if the right habits are established from the start. The core principle is simple: keep moisture out, and keep the timber treated.
All Satus Baltic buildings use slow-grown Nordic timber, which has a naturally tighter grain and higher resin content than fast-grown equivalents, making it inherently more resistant to moisture and decay. But even good timber benefits from a proper maintenance regime. Initial treatment — applying a penetrating wood preservative or stain within the first few months of installation — is the single most important step. After that, annual inspection and a light re-treatment every two to three years is typically sufficient to maintain both the appearance and the structural integrity of the building.
Specific things to check annually include the condition of the roof (particularly around flashings and any penetrations), the state of any external joinery, and the gap between the base of the building and the ground surface. Ensuring that water drains away from the building rather than pooling against the base will significantly extend the life of the floor structure. We cover all of this in detail in our complete guide to maintaining wooden houses, which is worth bookmarking before your building arrives.
What Does a Quality Timber Building Actually Cost in the UK?
Pricing is the question almost every buyer arrives at eventually, and the honest answer is that it varies considerably depending on size, specification, and what is included in the price. A compact garden office of around twenty square metres with 44mm walls, a standard roof, and basic windows and doors will typically cost between £4,000 and £7,000 ex-works from a European manufacturer, plus delivery, any foundation work and, for UK buyers, import VAT and any customs duty. A larger, well-specified building with 70mm or double-wall construction, upgraded windows, insulation packages, and a quality roof covering can reach £15,000 to £25,000 for a residential-grade structure — still significantly less than a brick-built equivalent of comparable quality.
The key is to think about total cost of ownership rather than purchase price. A well-built, properly specified timber building installed on a good foundation with appropriate maintenance will comfortably last thirty to fifty years. A cheaper building that requires significant remedial work after five years, or that needs replacing after ten, is not a saving — it is a deferral of the proper cost with an additional disruption fee built in.
If you are considering purchasing for resale or as a commercial venture, our wholesale and dealer guide covers the B2B market in detail, including how European supply chains work for trade buyers.
Getting a Quote and Next Steps
The best starting point is the Satus Baltic product catalogue, which shows the full range of standard models with dimensions, specification options, and configuration choices. Most buyers find a model that closely matches their requirements and then customise from there — adjusting wall thickness, roof type, window placement, and internal layout to suit their specific site and use case.
Quotes are provided within one working day and are fully itemised, so you can see exactly what is included and what optional upgrades add to the base price. There is no obligation, and the team is accustomed to working with UK and Irish buyers through the full process from initial enquiry to delivery. Get in touch here to start the conversation.
Frequently Asked Questions
Do I need planning permission for a wooden cabin in my garden in the UK?
Often not. In England, a single-storey garden building used for purposes incidental to the house (not as a bedroom or separate living accommodation) is permitted development if it is not forward of the principal elevation, is no higher than 4 metres with a dual-pitched roof or 3 metres with any other roof, has eaves no higher than 2.5 metres, is no higher than 2.5 metres within 2 metres of a boundary, and, with other buildings, covers no more than 50% of the land around the original house. Different rules apply to listed buildings, conservation areas, National Parks and AONBs, and Wales, Scotland and Northern Ireland have their own limits. Full guidance is on the Planning Portal; always confirm with your local planning authority.
Do I need planning permission for a garden room in Ireland?
Not if it fits Class 3 of the exempted development rules: since 27 July 2026 the total area of sheds, garden rooms and similar structures can be up to 30 square metres (previously 25), behind the front wall of the house, with at least 25 square metres of private open space left to the rear or side, no higher than 4 metres with a tiled or slated pitched roof (3 metres otherwise), and not used for human habitation. A detached habitable unit of 32–45 square metres falls under the separate, time-limited Class 3A with its own conditions. Confirm with your county council before you order.
What wall thickness should I choose for a garden office in the UK?
For a home office used year-round in the UK, a minimum of 58mm is recommended, with 70mm or the double 44+44mm system offering significantly better thermal performance and comfort in winter. The UK's persistent damp climate means thicker walls pay dividends in both comfort and long-term structural stability. Our wall thickness guide covers the options in detail.
How long does delivery take to the UK or Ireland?
Standard production and delivery takes four to eight weeks from order confirmation, depending on the model, specification, and time of year. Delivery to Ireland adds a small amount of time for sea freight. We confirm the exact timeline at the point of order, and most UK and Irish deliveries arrive within the standard window.
Can I assemble the building myself, or do I need a contractor?
Smaller buildings can be assembled by two people with basic construction experience using the detailed documentation provided. For larger or more complex structures, engaging a local timber frame contractor is straightforward — we provide full technical drawings in advance so a contractor can assess and quote the work before delivery arrives.
Is the timber FSC-certified?
Yes. All timber used in Satus Baltic buildings is FSC-certified, meaning it originates from responsibly managed forests. We provide full certification documentation with every order, which is useful if you need to satisfy planning conditions, building regulations, or insurer requirements relating to sustainable materials.
What foundation do I need?
For UK and Irish sites, we recommend either a poured concrete pad or an adjustable steel post system on compacted hardcore, combined with our 70×70mm timber base upgrade. The key considerations for British and Irish ground conditions are drainage and airflow beneath the floor — good preparation here significantly extends the life of the structure.
Can I customise the layout, windows, and finishes?
Yes — wall thickness, internal layout, window size and placement, door position, roof type, and finishing details can all be configured to suit your site and requirements. Custom dimensions are also available. Send us your sketch or brief and we will work up a specification and quote from there.
Sources
- Planning Portal – Outbuildings: planning permission (England)
- Planning Portal – Is building regulations approval needed for an outbuilding?
- Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class E
- GOV.UK – Permitted development rights for householders: technical guidance
- Building Regulations 2010, Schedule 2 (exempt buildings)
- GOV.WALES – Planning permission: outbuildings
- GOV.WALES – Building regulations: outbuildings
- gov.scot – Planning circular 1/2024: householder permitted development rights (Class 3A)
- gov.scot – Building standards technical handbook 2022: work not requiring a warrant
- Planning (General Permitted Development) Order (Northern Ireland) 2015, Schedule, Part 1, Class D
- Building Regulations (Northern Ireland) 2012, Schedule 2 (exempted buildings)
- Planning and Development Regulations 2001 (S.I. No. 600 of 2001), Article 9 and Schedule 2
- S.I. No. 338 of 2026 – Class 3 amended to 30 m²
- S.I. No. 340 of 2026 – Class 3A detached auxiliary dwelling
- gov.ie – Circular PLR-02: Planning and Development (Exempted Development (Act of 2000)) Regulations 2026
- GOV.UK – Import goods into the UK: step by step
- GOV.UK – Paying VAT on imports from outside the UK to Great Britain
- UK Trade Tariff – commodity 9406 10 00 00, prefabricated buildings of wood
- Revenue – Buying goods from an EU country
- Revenue – Non-established traders and intra-Community distance sales
- Revenue – Options for moving goods from the EU to Ireland through the UK
Rules checked against these sources on 24 September 2026. Planning and building rules can change and depend on your site, so always confirm with your local planning authority or county council before ordering.























